Barn Renovation Progress 2-21-14

It’s been slow progress in January and February because of the unusually cold winter.  With this warming trend, construction started back up and progress was made in plastering the walls and getting ready for the stone.  The stone on the south wall is 3/4 of the way completed, excluding grouting.  The bar has been prepared for stone as well as the fireplace.  Electrical is 90% completed and drywall is pending once the temperatures get into the 40’s.  It will start coming together quickly once the drywall is installed.  Keep checking back and I’ll do my best to post photos when there is something significant to report.[print_gllr id=1733 display=short]